Our Work History

Some of our past work history, on the many types of projects, that we have successfully completed are as follows:
- Installation of strip finishing equipment for Temple Inland Fiber Products and Mid-South Engineering Co.
- High pressure hydraulic piping project for Temple Inland Solid Wood Products and International Paper.
- Lengthen 2 batch digesters four foot for Temple Inland Fiber Products.
- Fabricated and installed chip, dust, log and sand chutes for Temple Inland Fiber Products, International Paper-Nacogdoches and Jefferson, Texas Foundries-Lufkin, Champion International Paper-Corrigan and Champion/Donohue-Lufkin, Louisiana Pacific-Corrigan.
- Turnkey installation of process conveyor and housing for Dal-Tile
- Turnkey installation of Dust Transport System, Sand Reclaim System and Disa Monorail Loop System for Texas Foundries-Lufkin.
- Turnkey fabrication and installation of many types of ventilation and collection systems.
- Custom fabrication of carbon steel, stainless steel, aluminum, copper and brass.
- Turnkey steam piping rebuild for Champion/Donohue-Lufkin.
- 316L potable water system for Abitibi Consolidated.
- 304L S.S. new city water line for Citation Corp.-Lufkin
- Sodium Chlorate process piping and equipment setting for Abitibi Consolidated.
- Set tanks and equipment and install process piping at American EChem of Lufkin.
- Fabricated and shipped several 30” diameter x 60’ long stainless steel headers with 100% X-ray to Phelps Dodge in Arizona.
- Install Cablevey system
- Install chemical suppression systems
- Install Sand reclaim system at Pumpworks.
If you would like references, please contact us and we will be happy to give you a list.